Lead Hand/Operator - Rubber Surfacing

GPI - Masters of Play - Calgary, AB (il y a 30+ jours)

Postuler dès maintenant

GPI is looking for a Leah Hand for our Rubber Surfacing Crew.

Applicants MUST HAVE:
* Commercial or Residential Excavation/Roofing/Framing/Concrete Finishing Experience. Min 3 Years.

* Skid Steer Experience as Asset

The positions requires the following:

Lead Hand

PRIMARY RESPONSIBILITIES INCLUDE:

  • Arriving on jobsites at least 15 minutes prior to arrival of crew members
  • Assisting crew lead with supervision of labourers and operators
  • Completing projects efficiently and professionally

· Delivering various site materials and equipment

· Handling small hand tools

  • Hauling site trailers safely between job sites

· Lifting 25-30 kg bags of materials

  • Loading and securing trailers (training will be provided)

· Operating a sawzall/reciprocating saw and tiger torch (training to be provided)

· Operating and maintaining concrete motor mixers (training to be provided)

  • Operating skid steers, excavators, and other equipment
  • Participating in company health & safety program
  • Performing other labour duties as needed
  • Periodically travelling outside of Calgary city limits for up to two-week time periods (accommodations and daily live-out-allowance will be provided when applicable)
  • Prepping for and laying sod

· Pushing wheelbarrows

· Removing garbage from job sites

· Shoveling & raking gravel and dirt

· Standing and setting up temporary fencing

· Sweeping with a broom

This job is set to start ASAP.

Wage: $22-$25/hr with PAID overtime.

We are seasonal and work when the weather is good. (and sometimes when it is not)

Please expect to work long hours and weekends.

Application deadline: 2020-07-10

Job Types: Full-time, Permanent

Salary: $22.00-$25.00 per hour

Schedule:

  • 12 Hour Shift
  • Day shift
  • Holidays
  • Monday to Friday
  • Overtime
  • Weekends

Experience:

  • Concrete Finishing: 3 years (Required)
  • Skid Steer: 5 years (Preferred)
  • Roofing: 3 years (Required)
  • excavation: 3 years (Required)
  • Framing: 3 years (Required)